Material Statement

State: Odisha District: Cuttack Block: Tangi Choudwar Gram Panchayat: Salagaon
Work Code: OD/350/3344/117165/399344/00042684 (Construction Of CC Road From Madhapur Teliapada Road)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Tangi Choudwar Bill Status: Final Bill
Proposal Date: - Date of Commencement: 01-12-2025
Date of Completion: 07-12-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Jayanta Kumar Sahoo
Administrative Approval Details
Approval No.: OD/350/3344/117165/399344/00042684/AS
Technical Sanction Details
Technical Sanction No.: OD/350/3344/117165/399344/00042684/TS
Fund Sanction No.: 15217
Fund Sanction Amount (in Rs.): 200000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 1.7575 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 15.900625 Cum 1 15.900625 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 16.516875 Cum - - 2.29 37.82364375 0.48 7.9281 0.96 15.8562 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 11.4975 Cum - - 3.23 37.136925 0.45 5.173875 - - 0.9 10.34775 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 24.195 Sqm - - - - - - - - - - 0.00267 0.06460065 0.126 3.04857
Total Qty 15.900625 74.96056875 13.101975 15.8562 10.34775 0.06460065 3.04857
Rate Per Unit 543.25 569.712 548.19 1808.31 2236.91 58573.086 229.106
Total Amount 8638.01453125 42705.9355437 7182.37167525 28672.925022 23146.9854525 3783.8594281059 698.44567842
Total Material Amount (in Rs.): 114828.53733123