Material Statement

State: Odisha District: Sundargarh Block: Gurundia Gram Panchayat: Tamparkela
Work Code: OD/373/3577/121590/385023/00045387 (Construction of CC road From Jalei Ramani Kisan House to Hockey Field)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Gurundia Bill Status: Final Bill
Proposal Date: - Date of Commencement: 01-12-2025
Date of Completion: 21-12-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Sumanti Kullu
Administrative Approval Details
Approval No.: OD/373/3577/121590/385023/00045387/AS
Technical Sanction Details
Technical Sanction No.: OD/373/3577/121590/385023/00045387/TS
Fund Sanction No.: 28788
Fund Sanction Amount (in Rs.): 369439
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 9.9 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 23.76 Cum 1 23.76 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 27.06 Cum - - 2.29 61.9674 0.48 12.9888 0.96 25.9776 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 20.6712 Cum - - 3.23 66.767976 0.45 9.30204 - - 0.9 18.60408 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 75.9 Sqm - - - - - - - - - - 0.00267 0.202653 0.126 9.5634
Total Qty 23.76 128.735376 22.29084 25.9776 18.60408 0.202653 9.5634
Rate Per Unit 673.45 573.132 678.39 2087.16 2488.53 58573.086 229.106
Total Amount 16001.172 73782.363517632 15121.8829476 54219.407616 46296.8112024 11870.011597158 2191.0323204
Total Material Amount (in Rs.): 219482.68120119