Material Statement

State: Odisha District: Puri Block: Krushnaprasad Gram Panchayat: Badajhada
Work Code: OD/369/3542/120993/410172/00048228 (CONSTN OF RURAL HAT AT SIPIA)
Project Category: Building
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Krushnaprasad Bill Status: 1st Bill
Proposal Date: - Date of Commencement: 27-11-2025
Date of Completion: - Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Development of Rural Haat Project Sub-Category: Market Complex
Project Type: New Work Name of Executant: Jitendra Das
Administrative Approval Details
Approval No.: OD/369/3542/120993/410172/00048228/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3542/120993/410172/00048228/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 1000000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM079 BRM060 BRM052 BRM104 BRM092 BRM084 BRM162 BRM341
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0101aa) :.Earthwork in ordinary soil in foundation and plinth within 50m, initial lead and 1.5m, initial lift - Earthwork in ordinary soil in foundation and plinth within 50m, initial lead and 1.5m, initial lift including rought dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge per 100 cum 61.3518868 Cum - - - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 6.80629684 Cum 1 6.80629684 - - - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 6.10545604 Cum - - 2.29 13.9814943316 0.48 2.9306188992 0.96 5.8612377984 - - - - - - - - - - - - - - - -
4 Masonry Stone Work (AR0717) :.Laterite stone masonry - Laterite stone masonry in cement mortar (1:6) in foundation and plinth cost conveyance, royalty, taxes of all materials, labor, required for the work, etc. complete and as per direction of the Engineer-in-charge. 10.417299180307 Cum - - 0.572 5.9586951311356 0.24 2.5001518032737 - - 1 10.417299180307 - - - - - - - - - - - - - -
5 R.C.C. Work (AR0404Aa) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC foundation, footing bases of column, mass concreate, pre-cast slabs etc.) 8.5047015788928 Cum - - 3.4733 29.539379993968 0.45 3.8271157105018 - - - - 0.36 3.0616925684014 0.54 4.5925388526021 0.004005 0.034061329823466 0.189 1.6073885984107 - - - - - -
6 R.C.C. Work (AR0404Ac) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 2.59895554752 Cum - - 3.4733 9.0269523032012 0.45 1.169529996384 - - - - 0.36 0.9356239971072 0.54 1.4034359956608 0.041529 0.10793202493296 - - 4.4196 11.486343937819 - - - -
7 R.C.C. Work (AR0404Ab) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Plinth band) 3.4688136067264 Cum - - 3.4733 12.048230300243 0.45 1.5609661230269 - - - - 0.36 1.2487728984215 0.54 1.8731593476323 0.01335 0.046308661649797 0.63 2.1853525722376 - - - - - -
8 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 11.99 Qntl - - - - - - - - - - - - - - - - - - - - 0.8 9.592 1.05 12.5895
Total Qty 6.80629684 70.554752060148 11.988382532386 5.8612377984 10.417299180307 5.2460894639301 7.8691341958952 0.18830201640622 3.7927411706484 11.486343937819 9.592 12.5895
Rate Per Unit 336.51 595.407 1258.91 2030.91 2348.41 2464.58 2428.2 58573.086 229.106 250.166 90.1 5834.687
Total Amount 2290.3869496284 42008.793259877 15092.294653846 11903.646457149 24464.089568025 12929.407171013 19107.831654473 11029.430200935 868.93975864257 2873.4927175485 864.2392 73455.7919865
Total Material Amount (in Rs.): 216888.34357764