Material Statement

State: Odisha District: Sundargarh Block: Lahunipara Gram Panchayat: Bhutuda
Work Code: OD/373/3582/121659/384956/00048452 (PROVISION OF FACILITY CENTER AT BHUTUDA GP HEAD QUARTER)
Project Category: Building
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Lahunipara Bill Status: 1st Bill
Proposal Date: 31-08-2024 Date of Commencement: 17-10-2025
Date of Completion: - Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Provision of Facilities at GP Head Quarter Project Sub-Category: GP Facility Centre
Project Type: New Work Name of Executant: PRASANTA ROUT
Administrative Approval Details
Approval No.: OD/373/3582/121659/384956/00048452/AS
Technical Sanction Details
Technical Sanction No.: OD/373/3582/121659/384956/00048452/TS
Fund Sanction No.: 28001
Fund Sanction Amount (in Rs.): 1000000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM006 BRMMR0025 BRM060 BRM052 BRM162 BRM341 BRM104 BRM092 BRM084 BRM064
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 33.9372 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 39.05003575 Cum 1 39.05003575 - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 10.567643 Cum - - 2.29 24.19990247 0.48 5.07246864 0.96 10.14493728 - - - - - - - - - - - - - - - - - - - -
4 Masonry Brick Work (AR0603c) :.Flyash Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 11.813685 Cum - - 0.672 7.93879632 0.28 3.3078318 - - 400 4725.474 - - - - - - - - - - - - - - - - - -
5 Masonry Brick Work (AR0603ci) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 28.797955 Cum - - 0.672 19.35222576 0.28 8.0634274 - - 400 11519.182 1 28.797955 - - - - - - - - - - - - - - - -
6 R.C.C. Work (AR0404A) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) 25.02592 Cum - - 3.4733 86.922527936 0.45 11.261664 - - - - - - 0.36 9.0093312 0.54 13.5139968 - - - - - - - - - - - -
7 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 23 Qntl - - - - - - - - - - - - - - - - 0.8 18.4 1.05 24.15 - - - - - - - -
8 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 68.902 Sqm - - - - - - - - - - - - - - - - - - - - 0.00267 0.18396834 0.126 8.681652 - - - -
9 R.C.C. Work (AR0410d) :.Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. beams, column, grider and bressmer, etc. Data for 4.2sqm 42.631 Sqm - - - - - - - - - - - - - - - - - - - - 0.0051904761904762 0.22127519047619 - - 0.55238095238095 23.548552380952 - -
10 Concrete (AR0317) :.2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) 64.4425 Sqm - - 0.1208 7.784654 0.0169 1.08907825 - - - - - - - - - - - - - - - - - - - - 0.0169 1.08907825
Total Qty 39.05003575 146.198106486 28.79447009 10.14493728 16244.656 28.797955 9.0093312 13.5139968 18.4 24.15 0.40524353047619 8.681652 23.548552380952 1.08907825
Rate Per Unit 803.65 612.017 808.59 2409.16 5.83526 33 2803.91 2796.2 90.1 6709.602 58858.446 514.466 535.526 2264.11
Total Amount 31382.561230488 89475.726537242 23282.920570073 24440.777097485 94791.79137056 950.332515 25261.353844992 37787.83785216 1657.84 162036.8883 23852.004455382 4466.414777832 12610.862062362 2465.7929566075
Total Material Amount (in Rs.): 534463.10357018