Material Statement

State: Odisha District: Kandhamal Block: Khajuripada Gram Panchayat: Sudrukumpa
Work Code: OD/359/3427/118945/415382/00048655 (IMPROVEMENT OF ROAD FROM SUDRUKUMPA PWD ROAD TO TADAMERU)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Khajuripada Bill Status: Final Bill
Proposal Date: - Date of Commencement: 04-09-2025
Date of Completion: 01-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: CC Road
Project Type: New Work Name of Executant: P SANTOSH KUMAR PATRA
Administrative Approval Details
Approval No.: OD/359/3427/118945/415382/00048655/AS
Technical Sanction Details
Technical Sanction No.: OD/359/3427/118945/415382/00048655/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 400000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM104 BRM092 BRM340 BRM028 BRM045 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 7.648641 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 23.77645725 Cum 1 23.77645725 - - - - - - - - - - - -
3 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 84.200844 Sqm - - 0.00267 0.22481625348 0.126 10.609306344 - - - - - - - -
4 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 32.763576465 Cum - - - - - - 2.29 75.02859010485 0.48 15.7265167032 0.96 31.4530334064 - -
5 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 22.84934925 Cum - - - - - - 3.23 73.8033980775 0.45 10.2822071625 - - 0.9 20.564414325
Total Qty 23.77645725 0.22481625348 10.609306344 148.83198818235 26.0087238657 31.4530334064 20.564414325
Rate Per Unit 476.21 58620.646 276.666 569.477 1030.79 1193.57 2193.43
Total Amount 11322.586707022 13178.874010297 2935.2343489691 84756.39413412 26809.532473525 37541.397082877 45106.603312885
Total Material Amount (in Rs.): 221650.6220697