Material Statement

State: Odisha District: Jharsuguda Block: Kolabira Gram Panchayat: Kelendamal
Work Code: OD/357/3406/118541/381244/00048748 (improvement of road at Tangarmunda)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Kolabira Bill Status: 1st Bill
Proposal Date: - Date of Commencement: 13-11-2025
Date of Completion: - Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: NIHAR RANJAN NAIK
Administrative Approval Details
Approval No.: OD/357/3406/118541/381244/00048748/AS
Technical Sanction Details
Technical Sanction No.: OD/357/3406/118541/381244/00048748/TS
Fund Sanction No.: 29133
Fund Sanction Amount (in Rs.): 900000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 83.623 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 65.123 Cum 1 65.123 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 78.81775 Cum - - 2.29 180.4926475 0.48 37.83252 0.96 75.66504 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 53.23015 Cum - - 3.23 171.9333845 0.45 23.9535675 - - 0.9 47.907135 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 74 Sqm - - - - - - - - - - 0.00267 0.19758 0.126 9.324
Total Qty 65.123 352.426032 61.7860875 75.66504 47.907135 0.19758 9.324
Rate Per Unit 342.01 564.582 415.11 1596.76 1998.13 58573.086 229.106
Total Amount 22272.71723 198973.39399862 25648.022782125 120818.9092704 95724.68365755 11572.87033188 2136.184344
Total Material Amount (in Rs.): 477146.78161458