Material Statement

State: Odisha District: Kendujhar Block: Saharapada Gram Panchayat: Dalapaka
Work Code: OD/361/3454/119495/385924/00049292 (CONST. OF CC ROAD FROM CHAKRA MAHANTA HOUSE TO JINGIMUNDA HOUSE AT BANDHA SAHI DALPAKA)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Saharapada Bill Status: Final Bill
Proposal Date: - Date of Commencement: 25-09-2025
Date of Completion: 31-10-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Manoj Kuamr Routray
Administrative Approval Details
Approval No.: OD/361/3454/119495/385924/00049292/AS
Technical Sanction Details
Technical Sanction No.: OD/361/3454/119495/385924/00049292/TS
Fund Sanction No.: 28963
Fund Sanction Amount (in Rs.): 143788
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM045 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 10.320625 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 8.39125 Cum 1 8.39125 - - - - - - - - - - - -
3 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 10.871875 Cum - - 2.29 24.89659375 0.48 5.2185 0.96 10.437 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 8.9425 Cum - - 3.23 28.884275 0.45 4.024125 - - 0.9 8.04825 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 14.7 Sqm - - - - - - - - - - 0.00267 0.039249 0.126 1.8522
Total Qty 8.39125 53.78086875 9.242625 10.437 8.04825 0.039249 1.8522
Rate Per Unit 526.31 584.302 601.41 1416.61 2036.61 58573.086 229.106
Total Amount 4416.3987875 31424.269172362 5558.60710125 14785.15857 16391.1464325 2298.935052414 424.3501332
Total Material Amount (in Rs.): 75298.865249226