Material Statement

State: Odisha District: Sonepur Block: Tarbha Gram Panchayat: Menda
Work Code: OD/372/3571/121499/419611/00051657 (CONST. OF C.C ROAD AT MENDA VILLAGE)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Tarbha Bill Status: Final Bill
Proposal Date: - Date of Commencement: 26-09-2025
Date of Completion: 31-10-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: GOBARDHAN MEHER
Administrative Approval Details
Approval No.: OD/372/3571/121499/419611/00051657/AS
Technical Sanction Details
Technical Sanction No.: OD/372/3571/121499/419611/00051657/TS
Fund Sanction No.: 1130
Fund Sanction Amount (in Rs.): 1000000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM104 BRM092 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 21.8 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 75.21 Cum 1 75.21 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 74.9375 Cum - - 2.29 171.606875 0.48 35.97 0.96 71.94 - - - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 255.06 Sqm - - - - - - - - 0.00267 0.6810102 0.126 32.13756 - -
5 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 67.6345 Cum - - 3.23 218.459435 0.45 30.435525 - - - - - - 0.9 60.87105
Total Qty 75.21 390.06631 66.405525 71.94 0.6810102 32.13756 60.87105
Rate Per Unit 413.05 564.002 417.99 1466.56 58715.766 371.786 1851.31
Total Amount 31065.4905 219998.17897262 27756.84539475 105504.3264 39986.035546813 11948.29488216 112691.1835755
Total Material Amount (in Rs.): 548950.35527184