Material Statement

State: Odisha District: Nabarangpur Block: Tentulikhunti Gram Panchayat: Amlabhatta
Work Code: OD/366/3521/120555/427979/00052548 (IMPROVEMENT OF ROAD WITH CC GR II METALLING AT PAIKA SAHI AMALABHATA)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Tentulikhunti Bill Status: Final Bill
Proposal Date: 07-08-2024 Date of Commencement: 24-10-2025
Date of Completion: 13-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: Mettalling Road
Project Type: Repair and Maintenance Name of Executant: UMAKANTA SAHANI
Administrative Approval Details
Approval No.: OD/366/3521/120555/427979/00052548/AS
Technical Sanction Details
Technical Sanction No.: OD/366/3521/120555/427979/00052548/TS
Fund Sanction No.: 5708
Fund Sanction Amount (in Rs.): 300000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 26.98 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 25.56 Cum 1 25.56 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 26.27 Cum - - 2.29 60.1583 0.48 12.6096 0.96 25.2192 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 18.6375 Cum - - 3.23 60.199125 0.45 8.386875 - - 0.9 16.77375 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 11.715 Sqm - - - - - - - - - - 0.00267 0.03127905 0.126 1.47609
Total Qty 25.56 120.357425 20.996475 25.2192 16.77375 0.03127905 1.47609
Rate Per Unit 478.15 585.117 482.34 1401.46 1802.83 58620.646 276.666
Total Amount 12221.514 70423.175443725 10127.4397515 35343.700032 30240.2197125 1833.5981172663 408.38391594
Total Material Amount (in Rs.): 160598.03097293