Material Statement

State: Odisha District: Gajapati Block: Kasinagar Gram Panchayat: Parthada
Work Code: OD/353/3359/117485/414561/00053156 (Construction of CC road and drain at Somasing Sahi at u.Joduru)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Kasinagar Bill Status: Final Bill
Proposal Date: - Date of Commencement: 18-09-2025
Date of Completion: 16-10-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Raj Kumar Sahoo
Administrative Approval Details
Approval No.: OD/353/3359/117485/414561/00053156/AS
Technical Sanction Details
Technical Sanction No.: OD/353/3359/117485/414561/00053156/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 201919
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 2.056 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 12.689 Cum 1 12.689 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 17.8175 Cum - - 2.29 40.802075 0.48 8.5524 0.96 17.1048 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 7.76215 Cum - - 3.23 25.0717445 0.45 3.4929675 - - 0.9 6.985935 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 13.6 Sqm - - - - - - - - - - 0.00267 0.036312 0.126 1.7136
Total Qty 12.689 65.8738195 12.0453675 17.1048 6.985935 0.036312 1.7136
Rate Per Unit 673.45 795.622 678.39 1596.76 1998.13 58573.086 229.106
Total Amount 8545.40705 52410.660018229 8171.456858325 27312.260448 13958.80630155 2126.905898832 392.5960416
Total Material Amount (in Rs.): 112918.09261654