Material Statement

State: Odisha District: Kandhamal Block: Raikia Gram Panchayat: Beredakia
Work Code: OD/359/3431/275320/417543/00053546 (IMP OF KAJURINAJU ROAD, BEREDAKIA)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Raikia Bill Status: Final Bill
Proposal Date: - Date of Commencement: 19-09-2025
Date of Completion: 19-11-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: MR SUBHENDU KUMAR PRADHAN
Administrative Approval Details
Approval No.: OD/359/3431/275320/417543/00053546/AS
Technical Sanction Details
Technical Sanction No.: OD/359/3431/275320/417543/00053546/TS
Fund Sanction No.: 28879
Fund Sanction Amount (in Rs.): 201919
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM104 BRM092 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 4.314 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 10.8268525007 Cum 1 10.8268525007 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 16.23957295 Cum - - 2.29 37.1886220555 0.48 7.794995016 0.96 15.589990032 - - - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 35.827 Sqm - - - - - - - - 0.00267 0.09565809 0.126 4.514202 - -
5 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 9.612378 Cum - - 3.23 31.04798094 0.45 4.3255701 - - - - - - 0.9 8.6511402
Total Qty 10.8268525007 68.2366029955 12.120565116 15.589990032 0.09565809 4.514202 8.6511402
Rate Per Unit 411.11 557.587 1214.79 2133.16 58573.086 229.106 2534.53
Total Amount 4451.0273315628 38047.842754452 14723.941297266 33255.943136661 5602.9895321657 1034.230763412 21926.574371106
Total Material Amount (in Rs.): 119042.54918663