Material Statement

State: Odisha District: Puri Block: Gop Gram Panchayat: Nuakholamara
Work Code: OD/369/3539/120948/409361/00054065 (Improvement of CC road from Taleswari Thakurani to Deuli Sahi Village road, Nuakholamara.)
Project Category: Road
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Gop Bill Status: Final Bill
Proposal Date: 12-10-2022 Date of Commencement: 04-10-2025
Date of Completion: 07-10-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: Manoj Kumar Swain
Administrative Approval Details
Approval No.: OD/369/3539/120948/409361/00054065/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3539/120948/409361/00054065/TS
Fund Sanction No.: 19249
Fund Sanction Amount (in Rs.): 200000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM104 BRM092 BRM340 BRM028 BRM056 BRM044 BRM029
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 13.53 Sqm 0.00267 0.0361251 0.126 1.70478 - - - - - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 11.34144375 Cum - - - - 3.23 36.6328633125 0.45 5.1036496875 0.9 10.207299375 - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 14.656425 Cum - - - - 2.29 33.56321325 0.48 7.035084 - - 0.96 14.070168 - -
4 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 3.606 Cum - - - - - - - - - - - - - -
5 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 15.1215 Cum - - - - - - - - - - - - 1 15.1215
Total Qty 0.0361251 1.70478 70.1960765625 12.1387336875 10.207299375 14.070168 15.1215
Rate Per Unit 58573.086 229.106 595.832 780.67 2580.53 2168.91 401.61
Total Amount 2115.9585890586 390.57532668 41825.068690387 9476.3452278206 26340.242256169 30516.92807688 6072.945615
Total Material Amount (in Rs.): 116738.063782