Material Statement

State: Odisha District: Gajapati Block: Rayagad Gram Panchayat: Marlaba
Work Code: OD/353/3363/117559/414740/00054499 (Provision of Facility Centre at Marloba GP Hqrts)
Project Category: Building
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Rayagad Bill Status: 1st Bill
Proposal Date: - Date of Commencement: 19-11-2025
Date of Completion: - Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Provision of Facilities at GP Head Quarter Project Sub-Category: GP Facility Centre
Project Type: New Work Name of Executant: ARCHANA NAYAK
Administrative Approval Details
Approval No.: OD/353/3363/117559/414740/00054499/AS
Technical Sanction Details
Technical Sanction No.: OD/353/3363/117559/414740/00054499/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 1000000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM162 BRM341 BRM005 BRM060 BRM052 BRM104 BRM092 BRM084 BRM094
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 3.88215 Cum 1 3.88215 - - - - - - - - - - - - - - - - - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 16.36524 Cum - - 2.29 37.4763996 0.48 7.8553152 0.96 15.7106304 - - - - - - - - - - - - - - - - - -
3 Earth Work (AR0103a) :.Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift - Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department 26.711775 Cum - - - - - - - - - - - - - - - - - - - - - - - - - -
4 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 11.91225 Qntl - - - - - - - - 0.8 9.5298 1.05 12.5078625 - - - - - - - - - - - - - -
5 Masonry Brick Work (AR0603b) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 24.593544 Cum - - 0.672 16.526861568 0.28 6.88619232 - - - - - - 350 8607.7404 - - - - - - - - - - - -
6 R.C.C. Work (AR0404Aa) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC foundation, footing bases of column, mass concreate, pre-cast slabs etc.) 3.46779 Cum - - 3.4733 12.044675007 0.45 1.5605055 - - - - - - - - 0.36 1.2484044 0.54 1.8726066 0.004005 0.01388849895 0.189 0.65541231 - - - -
7 R.C.C. Work (AR0404Ab) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Plinth band) 3.70185 Cum - - 3.4733 12.857635605 0.45 1.6658325 - - - - - - - - 0.36 1.332666 0.54 1.998999 0.01335 0.0494196975 0.63 2.3321655 - - - -
8 R.C.C. Work (AR0404Ac) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 1.271187 Cum - - 3.4733 4.4152138071 0.45 0.57203415 - - - - - - - - 0.36 0.45762732 0.54 0.68644098 0.041529 0.052791124923 - - 4.4196 5.6181380652 - -
9 R.C.C. Work (AR0404Ad) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) 1.73282 Cum - - 3.4733 6.018603706 0.45 0.779769 - - - - - - - - 0.36 0.6238152 0.54 0.9357228 0.0741335 0.12846001147 - - - - 3.7695 6.53186499
10 R.C.C. Work (AR0404Ag) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 0.3939 Cum - - 3.4733 1.36813287 0.45 0.177255 - - - - - - - - 0.36 0.141804 0.54 0.212706 0.0502172 0.01978055508 - - 6.2216 2.45068824 - -
Total Qty 3.88215 90.7075221631 19.49690367 15.7106304 9.5298 12.5078625 8607.7404 3.80431692 5.70647538 0.264339887923 2.98757781 8.0688263052 6.53186499
Rate Per Unit 738.55 801.567 743.49 1466.56 90.1 6430.397 6.89015 1955.08 1918.7 58763.326 419.346 440.406 430.346
Total Amount 2867.1618825 72708.15641771 14495.752909608 23040.582119424 858.63498 80430.521496413 59308.62251706 7437.7439239536 10949.014311606 15533.491008823 1252.8288043123 3553.5595177679 2810.9619709865
Total Material Amount (in Rs.): 295247.03186016