Material Statement

State: Odisha District: Sundargarh Block: Tangarpali Gram Panchayat: Kiripsira
Work Code: OD/373/3589/121772/383769/00056084 (CONSTRUCTION OF CC ROAD FROM SANTOSH BILUNG HOUSE TO RD ROAD AT SURDA SAJGORIPADAD)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Tangarpali Bill Status: Final Bill
Proposal Date: - Date of Commencement: 14-10-2025
Date of Completion: 20-11-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO ZILLA PARISHAD Project Sub-Category: CC Road
Project Type: New Work Name of Executant: PANCHAMI DHURUA
Administrative Approval Details
Approval No.: OD/373/3589/121772/383769/00056084/AS
Technical Sanction Details
Technical Sanction No.: OD/373/3589/121772/383769/00056084/TS
Fund Sanction No.: 3154
Fund Sanction Amount (in Rs.): 157165
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM044 BRM056 BRM029 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 12.3 Cum 2.29 28.167 0.48 5.904 0.96 11.808 - - - - - - - -
2 Earth Work (AR0102a1) :.Earthwork in hard soil or gravelly soil within 50m to 75m lead and 1.5m, initial lift - Earthwork in hard soil or gravelly soil within 50m to 75m lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. 13.284 Cum - - - - - - - - - - - - - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 8.8245 Cum 3.23 28.503135 0.45 3.971025 - - 0.9 7.94205 - - - - - -
4 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 11.316 Cum - - - - - - - - 1 11.316 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 9.84 Sqm - - - - - - - - - - 0.00267 0.0262728 0.126 1.23984
Total Qty 56.670135 9.875025 11.808 7.94205 11.316 0.0262728 1.23984
Rate Per Unit 582.292 483.09 1336.36 1737.73 478.15 58573.086 229.106
Total Amount 32998.56624942 4770.52582725 15779.73888 13801.1385465 5410.7454 1538.8789738608 284.05478304
Total Material Amount (in Rs.): 74583.648660071