Material Statement

State: Odisha District: Nayagarh Block: Bhapur Gram Panchayat: Bijipur
Work Code: OD/367/3523/120594/406108/00057380 (Const of Malibereni Dakhinapata Baritala CC Road)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Bhapur Bill Status: Final Bill
Proposal Date: - Date of Commencement: 23-10-2025
Date of Completion: 20-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: Repair and Maintenance Name of Executant: Dillip Udalin
Administrative Approval Details
Approval No.: OD/367/3523/120594/406108/00057380/AS
Technical Sanction Details
Technical Sanction No.: OD/367/3523/120594/406108/00057380/TS
Fund Sanction No.: 31192
Fund Sanction Amount (in Rs.): 186532
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0122Aia) :.Earthwork in all kinds of soil in foundation and plinth within 50m, initial lead and 1.5m, initial lift - Earthwork in all kinds of soil in foundation and plinth within 50m, initial lead and 1.5m, initial lift including rought dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge 16.165 Cum - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 8.0825 Cum 1 8.0825 - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 16.165 Cum - - 2.29 37.01785 0.48 7.7592 0.96 15.5184 - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 11.740975 Cum - - 3.23 37.92334925 0.45 5.28343875 - - 0.9 10.5668775
Total Qty 8.0825 74.94119925 13.04263875 15.5184 10.5668775
Rate Per Unit 423.72 587.627 430.15 1360.21 1802.83
Total Amount 3424.7169 44037.47209168 5610.2910583125 21108.282864 19050.283763325
Total Material Amount (in Rs.): 93231.046677317