Material Statement

State: Odisha District: Kalahandi Block: Dharamagarh Gram Panchayat: Behera
Work Code: OD/358/3410/118627/424003/00060849 (REPAIR & MAINTENANCE OF NUNPANI UP SCHOOL,BEHERA GP)
Project Category: Building
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Dharamagarh Bill Status: Final Bill
Proposal Date: 22-11-2022 Date of Commencement: 10-11-2025
Date of Completion: 30-01-2026 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance of Primary School Building Project Sub-Category: Elementary School
Project Type: Repair and Maintenance Name of Executant: Romanchal Bhoi
Administrative Approval Details
Approval No.: OD/358/3410/118627/424003/00060849/AS
Technical Sanction Details
Technical Sanction No.: OD/358/3410/118627/424003/00060849/TS
Fund Sanction No.: 22574
Fund Sanction Amount (in Rs.): 151000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM174 BRM340 BRM028 BRM131 BRMMR0027 BRM130 BRM134
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Other Building Items. (AR1901B) :.Vitrified Tile 600mmx600mm Plain Ivory - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Plain Ivory in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all materials, taxes, labour, T&P , etc. required for the work all complete as per direction of Engineer-in-charge(for new work only) 103.7975 Sqm 0.0076 0.788861 0.1074 11.1478515 0.021 2.1797475 1 103.7975 - - - - - -
2 Flooring (AR0817a) :.Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) - Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Engineer-in-charge 3.34 Sqm - - 0.1375 0.45925 0.015 0.0501 - - 1 3.34 1 3.34 - -
3 Flooring (AR0816j) :.Fixing Chequred Tiles in floor , treads or steps and landing on a 25mm thick bed of cement mortar 1:1 - Fixing Chequred Tiles in floor , treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (1cement: 1sand) jointed with neat cement slurry mixed with pigment to match the shades of the Chequred tiles including rubbing and polishing, cost of precast tiles complete as per direction of Enginer-in-charge. 7.99 Sqm - - 0.2737 2.186863 0.013 0.10387 - - 1 7.99 - - 1 7.99
Total Qty 0.788861 13.7939645 2.3337175 103.7975 11.33 3.34 7.99
Rate Per Unit 2053.857 611.157 483.09 663.9538891 8.5 462.9538891 254.75
Total Amount 1620.207686877 8430.2779619265 1127.395587075 68916.753803857 96.305 1546.265989594 2035.4525
Total Material Amount (in Rs.): 83772.65852933