State: Odisha District: Puri Block: Gop Gram Panchayat: Jangalbori
Work Code: OD/369/3539/120944/409400/00061234 (COnst. of CC road from Chhabindra Sahoo house to Akhandalmani Pitha)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Gop Bill Status: 1st Bill
Proposal Date: 03-06-2023 Date of Commencement: 22-10-2025
Date of Completion: - Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Kamalakanta Baskey
Administrative Approval Details
Approval No.: OD/369/3539/120944/409400/00061234/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3539/120944/409400/00061234/TS
Fund Sanction No.: 304836
Fund Sanction Amount (in Rs.): 304836
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM056 BRM104 BRM092 BRM044
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 30.8369952 Cum 3.23 99.603494496 0.45 13.87664784 0.9 27.75329568 - - - - - -
2 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 21.36769 Sqm - - - - - - 0.00267 0.0570517323 0.126 2.69232894 - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 6.95743776 Cum 2.29 15.9325324704 0.48 3.3395701248 - - - - - - 0.96 6.6791402496
Total Qty 115.5360269664 17.2162179648 27.75329568 0.0570517323 2.69232894 6.6791402496
Rate Per Unit 595.832 806.71 2580.53 58573.086 229.106 2168.91
Total Amount 68840.062019444 13888.495194384 71618.21210111 3341.6960224569 616.82871412764 14486.45407876
Total Material Amount (in Rs.): 172791.74813028