Material Statement

State: Odisha District: Puri Block: Satyabadi Gram Panchayat: Sukal
Work Code: OD/369/3546/121105/409700/00061767 (Const of CC Road from GP Road to Crematorium Ground Road)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Satyabadi Bill Status: Final Bill
Proposal Date: 31-12-2024 Date of Commencement: 23-10-2025
Date of Completion: 28-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: NILIMA MOHANTY
Administrative Approval Details
Approval No.: OD/369/3546/121105/409700/00061767/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3546/121105/409700/00061767/TS
Fund Sanction No.: 31142
Fund Sanction Amount (in Rs.): 186532
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 44.3475 Cum 1 44.3475 - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 11.315 Cum - - 2.29 25.91135 0.48 5.4312 0.96 10.8624 - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 11.858 Cum - - 3.23 38.30134 0.45 5.3361 - - 0.9 10.6722
Total Qty 44.3475 64.21269 10.7673 10.8624 10.6722
Rate Per Unit 466.71 589.887 481.21 1846.91 2258.53
Total Amount 20697.421725 37878.23106603 5181.332433 20061.875184 24103.483866
Total Material Amount (in Rs.): 107922.34427403