Material Statement

State: Odisha District: Puri Block: Gop Gram Panchayat: Nagapur
Work Code: OD/369/3539/120947/409499/00061770 (Improvement of Baligoradi Mohanty Sahi CC road)
Project Category: Road
Financial Year: 2020-21 Execution Level: ps
Executing Agency: Panchayat Samiti, Gop Bill Status: Final Bill
Proposal Date: 15-07-2021 Date of Commencement: 24-10-2025
Date of Completion: 25-10-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: Manoj Kumar Swain
Administrative Approval Details
Approval No.: OD/369/3539/120947/409499/00061770/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3539/120947/409499/00061770/TS
Fund Sanction No.: 11088
Fund Sanction Amount (in Rs.): 118350
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 2.584 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 5.3 Cum 1 5.3 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 9.331044 Cum - - 2.29 21.36809076 0.48 4.47890112 0.96 8.95780224 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 6.254 Cum - - 3.23 20.20042 0.45 2.8143 - - 0.9 5.6286 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 9.69 Sqm - - - - - - - - - - 0.00267 0.0258723 0.126 1.22094
Total Qty 5.3 41.56851076 7.29320112 8.95780224 5.6286 0.0258723 1.22094
Rate Per Unit 401.61 595.832 780.67 2168.91 2580.53 58601.622 257.642
Total Amount 2128.533 24767.848903152 5693.5833183504 19428.666856358 14524.771158 1516.1587448706 314.56542348
Total Material Amount (in Rs.): 68374.127404212