State: Odisha District: Jagatsinghpur Block: Erasama Gram Panchayat: Nuadihi
Work Code: OD/355/3388/118109/397331/00062270 (Repair and maintenance of PHC at Mallipur )
Project Category: Building
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Erasama Bill Status: Final Bill
Proposal Date: - Date of Commencement: 31-10-2025
Date of Completion: 10-12-2025 Scheme Name: Asset Management Health and Family Welfare Department
Scheme Component Name: Self/Personal Deposit Project Sub-Category: Primary Health Centre
Project Type: Repair and Maintenance Name of Executant: Susanta Kumar Nanda
Administrative Approval Details
Approval No.: OD/355/3388/118109/397331/00062270/AS
Technical Sanction Details
Technical Sanction No.: OD/355/3388/118109/397331/00062270/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 200000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM064 BRM056 BRMMR0025 BRM005
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0318) :.4cm thick grading concrete (1:2:4) on roof slab with 12mm size hard granite chips (Crusher Broken) - 4cm thick grading concrete (1:2:4) on roof slab with 12mm size hard granite chips (Crusher Broken) including hoisting and laying in position compacting and curing for the proper period with cost conveyance, royalty, taxes of all materials, labor and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (Old Work) 123.839699 Sqm 0.1287 15.9381692613 0.018 2.229114582 0.018 2.229114582 0.018 2.229114582 - - - -
2 Plastering (AR1027) :.6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. 33.44508 Sqm 0.0372 1.244156976 0.0075 0.2508381 - - - - - - - -
3 Dismantling (AR1621) :.Removing old grading plaster from roof - Removing old grading plaster from roof slab, cleaning the surface,lowering and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 123.839699 Sqm - - - - - - - - - - - -
4 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 44.59344 Sqm 0.043 1.91751792 0.018 0.80268192 - - - - - - - -
5 Masonry Brick Work (AR0603bi) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 1.034129536 Cum 0.672 0.694935048192 0.28 0.28955627008 - - - - 1 1.034129536 350 361.9453376
6 Dismantling (AR1625) :.Dismantling and removing R.C.C. Chajja, Shelves, fins and parapet - Dismantling and removing R.C.C. Chajja, Shelves, fins and parapet including stacking the useful materials for reuse and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 33.44508 Sqm - - - - - - - - - - - -
7 Dismantling (AR1613) :.Removing old lime or cement plaster - Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 44.59344 Sqm - - - - - - - - - - - -
Total Qty 19.794779205492 3.57219087208 2.229114582 2.229114582 1.034129536 361.9453376
Rate Per Unit 613.327 790.4 2402.11 2948.53 33 7.00795
Total Amount 12140.672545767 2823.459665292 5354.578428568 6572.6112184645 34.126274688 2536.4948286339
Total Material Amount (in Rs.): 29461.942961413