Material Statement

State: Odisha District: Nabarangpur Block: Tentulikhunti Gram Panchayat: Tentulikhunti
Work Code: OD/366/3521/120569/428000/00062804 (REPAIR AND MAINTENANCE OF CLASS ROOM AT GPS HATHIPAKHANA)
Project Category: Building
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Tentulikhunti Bill Status: Final Bill
Proposal Date: 25-07-2025 Date of Commencement: 12-11-2025
Date of Completion: 13-11-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: Elementary School
Project Type: New Work Name of Executant: BRAJABIHARI MAHAKUD
Administrative Approval Details
Approval No.: OD/366/3521/120569/428000/00062804/AS
Technical Sanction Details
Technical Sanction No.: OD/366/3521/120569/428000/00062804/TS
Fund Sanction No.: 28365
Fund Sanction Amount (in Rs.): 100000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM253 BRM142 BRM255
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Plastering (AR1014k) :.16mm thick cement Plaster in CM (1:6) over brick work in inside (inside)(For repair and maintenance) . - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc. comp. and as per direction of Engineer-in-charge(For repair and maintenance). 147.516 Sqm 0.043 6.343188 0.018 2.655288 - - - - - -
2 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 301.689 Sqm - - - - 0.084 25.341876 - - - -
3 Painting(AR0922) :.Finishing wall two coats with distemper of approved shades on new work (Inside) - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 74.489 Sqm - - - - - - 0.25 18.62225 - -
4 Painting(AR0918Ai) :.Finishing wall one coat with weather coat - Finishing wall one coat with weather coat including all costs of labour, Paint, Primer and Brushes required for the work etc. complete and as per direction of Engineer-in-charge. 138.738 Sqm - - - - - - - - 0.075 10.40535
5 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 138.738 Sqm 0.0358 4.9668204 0.015 2.08107 - - - - - -
Total Qty 11.3100084 4.736358 25.341876 18.62225 10.40535
Rate Per Unit 585.117 482.34 159.33732 70.40732 195.09732
Total Amount 6617.6781849828 2284.53491772 4037.9066056123 1311.14271487 2030.055898662
Total Material Amount (in Rs.): 16281.318321847