Material Statement

State: Odisha District: Khordha Block: Tangi Gram Panchayat: Rameswar
Work Code: OD/362/3465/119698/407970/00063083 (construction of cc road from rd road hasan saha house to brahman sahi)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Tangi Bill Status: Final Bill
Proposal Date: - Date of Commencement: 31-10-2025
Date of Completion: 05-12-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES Project Sub-Category: CC Road
Project Type: New Work Name of Executant: SASMITA UDGATA
Administrative Approval Details
Approval No.: OD/362/3465/119698/407970/00063083/AS
Technical Sanction Details
Technical Sanction No.: OD/362/3465/119698/407970/00063083/TS
Fund Sanction No.: 15630
Fund Sanction Amount (in Rs.): 400000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM104 BRM092 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 4.48875 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 22.77625 Cum 1 22.77625 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 30.2575 Cum - - 2.29 69.289675 0.48 14.5236 0.96 29.0472 - - - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 93.1 Sqm - - - - - - - - 0.00267 0.248577 0.126 11.7306 - -
5 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 24.2725 Cum - - 3.23 78.400175 0.45 10.922625 - - - - - - 0.9 21.84525
Total Qty 22.77625 147.68985 25.446225 29.0472 0.248577 11.7306 21.84525
Rate Per Unit 1148.1 569.387 1154.49 1336.36 58573.086 229.106 1713.82
Total Amount 26149.412625 84092.68062195 29377.41230025 38817.516192 14559.921998622 2687.5508436 37438.826355
Total Material Amount (in Rs.): 233123.32093642