Material Statement

State: Odisha District: Mayurbhanj Block: Gopabandhunagar Gram Panchayat: Titia
Work Code: OD/365/3494/120162/390869/00063236 (IMP OF ROAD FROM PWD ROAD TO TANGANA ROAD WITH CONST OF CULVERT WITH APPROACH CC ROAD AT PATHARA)
Project Category: Road
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Gopabandhunagar Bill Status: Final Bill
Proposal Date: - Date of Commencement: 15-11-2025
Date of Completion: 18-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: SAILABALA SETHI
Administrative Approval Details
Approval No.: OD/365/3494/120162/390869/00063236/AS
Technical Sanction Details
Technical Sanction No.: OD/365/3494/120162/390869/00063236/TS
Fund Sanction No.: 10046
Fund Sanction Amount (in Rs.): 159826
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 19.6330568448 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 9.06128538624 Cum 1 9.06128538624 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 10.57149961728 Cum - - 2.29 24.208734123571 0.48 5.0743198162944 0.96 10.148639632589 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 9.06128538624 Cum - - 3.23 29.267951797555 0.45 4.077578423808 - - 0.9 8.155156847616 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 9.9097028816 Sqm - - - - - - - - - - 0.00267 0.026458906693872 0.126 1.2486225630816
Total Qty 9.06128538624 53.476685921126 9.1518982401024 10.148639632589 8.155156847616 0.026458906693872 1.2486225630816
Rate Per Unit 596.84 650.732 603.26 1726.96 2128.33 58573.086 229.106
Total Amount 5408.1375699235 34798.990782826 5520.9741323242 17526.294699896 17356.864973487 1549.7798172461 286.06692093737
Total Material Amount (in Rs.): 82447.10889664