Material Statement

State: Odisha District: Jajpur Block: Dharmasala Gram Panchayat: Thanual
Work Code: OD/356/3397/118364/401203/00063564 (CONSTRUCTION OF DRAIN FROM KANTABANIA TARINI MANDAP TO PRAKASH JENA HOUSE)
Project Category: CD Work
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Dharmasala Bill Status: Final Bill
Proposal Date: - Date of Commencement: 20-11-2025
Date of Completion: 11-12-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: Drain Masonry or Cement Concrete
Project Type: New Work Name of Executant: SMRUTIREKHA DHADA
Administrative Approval Details
Approval No.: OD/356/3397/118364/401203/00063564/AS
Technical Sanction Details
Technical Sanction No.: OD/356/3397/118364/401203/00063564/TS
Fund Sanction No.: 15612
Fund Sanction Amount (in Rs.): 250000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM060 BRM052 BRM162 BRM341 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 47.234 Cum - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 5.3675 Cum 1 5.3675 - - - - - - - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 6.35625 Cum - - 2.29 14.5558125 0.48 3.051 0.96 6.102 - - - - - - - - - - - -
4 R.C.C. Work (AR0404A) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) 19.06125 Cum - - 3.4733 66.205439625 0.45 8.5775625 - - 0.36 6.86205 0.54 10.293075 - - - - - - - -
5 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 5.0155125 Qntl - - - - - - - - - - - - 0.8 4.01241 1.05 5.266288125 - - - -
6 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 146.9 Sqm - - - - - - - - - - - - - - - - 0.00267 0.392223 0.126 18.5094
Total Qty 5.3675 80.761252125 11.6285625 6.102 6.86205 10.293075 4.01241 5.266288125 0.392223 18.5094
Rate Per Unit 347.95 571.667 352.89 1346.81 1821.31 1788.5 90.1 7977.367 58573.086 229.106
Total Amount 1867.621625 46168.542718542 4103.603420625 8218.23462 12497.9202855 18409.1646375 361.518141 42011.113100867 22973.711510178 4240.6145964
Total Material Amount (in Rs.): 160852.04465561