Material Statement

State: Odisha District: Nabarangpur Block: Raighar Gram Panchayat: Chhelidangari
Work Code: OD/366/3520/120532/427256/00064025 (Const. of CC road with CD work at village Pilapara)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Raighar Bill Status: Final Bill
Proposal Date: - Date of Commencement: 11-11-2025
Date of Completion: 14-11-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO ZILLA PARISHAD Project Sub-Category: CC Road
Project Type: New Work Name of Executant: SUKANTA MEHER
Administrative Approval Details
Approval No.: OD/366/3520/120532/427256/00064025/AS
Technical Sanction Details
Technical Sanction No.: OD/366/3520/120532/427256/00064025/TS
Fund Sanction No.: 4648
Fund Sanction Amount (in Rs.): 460000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM104 BRM092 BRM340 BRM028 BRM045 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 38.259 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 32.373 Cum 1 32.373 - - - - - - - - - - - -
3 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 53.955 Sqm - - 0.00267 0.14405985 0.126 6.79833 - - - - - - - -
4 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 40.221 Cum - - - - - - 2.29 92.10609 0.48 19.30608 0.96 38.61216 - -
5 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 25.75125 Cum - - - - - - 3.23 83.1765375 0.45 11.5880625 - - 0.9 23.176125
Total Qty 32.373 0.14405985 6.79833 175.2826275 30.8941425 38.61216 23.176125
Rate Per Unit 738.55 58620.646 276.666 579.172 742.74 1193.57 2396.53
Total Amount 23909.07915 8444.8814696631 1880.86676778 101518.78993443 22946.31540045 46086.3158112 55542.27884625
Total Material Amount (in Rs.): 260328.52737977