Material Statement

State: Odisha District: Bargarh Block: Bargarh Gram Panchayat: Katapali
Work Code: OD/347/3312/116383/380593/00064066 (Completion of CC Road from Railway crossing to +3 College road under Katapali GP under Bargarh Block)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Bargarh Bill Status: Final Bill
Proposal Date: - Date of Commencement: 20-11-2025
Date of Completion: 03-12-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO ZILLA PARISHAD Project Sub-Category: CC Road
Project Type: Completion Name of Executant: P T SUKANTI RAJ
Administrative Approval Details
Approval No.: OD/347/3312/116383/380593/00064066/AS
Technical Sanction Details
Technical Sanction No.: OD/347/3312/116383/380593/00064066/TS
Fund Sanction No.: 4190
Fund Sanction Amount (in Rs.): 364291
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 6.24 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 48.12 Cum 1 48.12 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 33.12 Cum - - 2.29 75.8448 0.48 15.8976 0.96 31.7952 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 22.5 Cum - - 3.23 72.675 0.45 10.125 - - 0.9 20.25 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 31.2 Sqm - - - - - - - - - - 0.00267 0.083304 0.126 3.9312
Total Qty 48.12 148.5198 26.0226 31.7952 20.25 0.083304 3.9312
Rate Per Unit 336.31 567.292 343.94 1289.29 1737.73 58573.086 229.106
Total Amount 16183.2372 84254.0943816 8950.213044 40993.233408 35189.0325 4879.372356144 900.6615072
Total Material Amount (in Rs.): 191349.84439694