Material Statement

State: Odisha District: Nayagarh Block: Odagaon Gram Panchayat: Giridipalli
Work Code: OD/367/3529/120706/406491/00064283 (REPAIR & MAINTENANCE OF GOVT. P.S , DAHANGI)
Project Category: Building
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Odagaon Bill Status: Final Bill
Proposal Date: - Date of Commencement: 13-11-2025
Date of Completion: 03-12-2025 Scheme Name: Asset Management School and Mass Education Department
Scheme Component Name: Self/Personal Deposit Project Sub-Category: Elementary School
Project Type: Repair and Maintenance Name of Executant: Keshab Chandra Beherdalai
Administrative Approval Details
Approval No.: OD/367/3529/120706/406491/00064283/AS
Technical Sanction Details
Technical Sanction No.: OD/367/3529/120706/406491/00064283/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 150000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM060 BRM052 BRM084 BRM104 BRM162 BRM341 BRMMR0025 BRM005 BRMMR0027 BRM130 BRM129 BRM255 BRM253 BRM137 BRM141
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 1.33375 Cum 1 1.33375 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 1.33375 Cum - - 2.29 3.0542875 0.48 0.6402 0.96 1.2804 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 1.3918125 Cum - - 3.23 4.495554375 0.45 0.626315625 - - 0.9 1.25263125 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
4 R.C.C. Work (AR0404Ag) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 0.2278125 Cum - - 3.4733 0.79126115625 0.45 0.102515625 - - - - 0.36 0.0820125 0.54 0.12301875 6.2216 1.41735825 0.0502172 0.011440105875 - - - - - - - - - - - - - - - - - - - - - -
5 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 0.2 Qntl - - - - - - - - - - - - - - - - - - 0.8 0.16 1.05 0.21 - - - - - - - - - - - - - - - - - -
6 Masonry Brick Work (AR0603bi) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 2.368125 Cum - - 0.672 1.59138 0.28 0.663075 - - - - - - - - - - - - - - - - 1 2.368125 350 828.84375 - - - - - - - - - - - - - -
7 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 39.01 Sqm - - 0.0358 1.396558 0.015 0.58515 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
8 Flooring (AR0816) :.Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in floor - Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in floor , treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (1cement: 1sand) jointed with neat cement slurry mixed with pigment to match the shades of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Enginer-in-charge. 5.22 Sqm - - 0.2737 1.428714 0.013 0.06786 - - - - - - - - - - - - - - - - - - - - 1 5.22 1 5.22 - - - - - - - - - -
9 Flooring (AR0817b) :.Fixing ceramic tiles (20cmx30cm / 20cmx20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) - Fixing ceramic tiles (20cmx30cm / 20cmx20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) in wall cladding on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Engineer-in-charge. 28.2 Sqm - - 0.1375 3.8775 0.015 0.423 - - - - - - - - - - - - - - - - - - - - - - - - 1 28.2 - - - - - - - -
10 Painting(AR0918cb) :.Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 39.01 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 4.87625 0.090322580645161 3.5234838709677 - - - -
11 Dismantling (AR1612) :.Dismantling and removing 2.5 cm. thick artificial stone flooring - Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 5.307 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
12 Dismantling (AR1613) :.Removing old lime or cement plaster - Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 54 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
13 Painting(AR0903b) :.Painting two coats of enamel paint with a coat of red oxide primer over iron surface - Painting two coats of enamel paint with a coat of red oxide primer over iron surface including all costs of labour, Paint, Primer, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge. 11.1375 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.054 0.601425 0.125 1.3921875
14 Iron Work(AR1704) :.Iron Doors and windows fixing - Supplying, fitting & fixing of Mild steel and put up for frames & shutters of Doors and windows fixing in position with cost, conveyance, taxes of all materials, labours and T & P required for the work etc. as per direction of Engineer-in-charge. 1.7325 Qntl - - - - - - - - - - - - - - - - - - - - 1 1.7325 - - - - - - - - - - - - - - - - - -
Total Qty 1.33375 16.63525503125 3.10811625 1.2804 1.25263125 0.0820125 0.12301875 1.41735825 0.011440105875 0.16 1.9425 2.368125 828.84375 5.22 5.22 28.2 4.87625 3.5234838709677 0.601425 1.3921875
Rate Per Unit 332.58 587.627 729.61 1230.01 1672.63 2085.28 2026.9 250.166 58573.086 90.1 6666.717 33 6.00665 8.5 453.9311111 414.6011111 195.03787 159.27787 142.94787 199.22787
Total Amount 443.578575 9775.3250082483 2267.7126971625 1574.904804 2095.1886076875 171.019026 249.346704375 354.5748439695 670.08230526548 14.416 12950.0977725 78.148125 4978.5743109375 44.37 2369.520399942 11691.75133302 951.0534135875 561.2130059471 85.97242271475 277.36255026562
Total Material Amount (in Rs.): 51604.211905623