Material Statement

State: Odisha District: Bargarh Block: Paikmal Gram Panchayat: Bhengrajpur
Work Code: OD/347/3320/116535/379752/00065319 (Construction of CC Road from Biju Express Way to Lochan Pandey House)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Paikmal Bill Status: Final Bill
Proposal Date: - Date of Commencement: 26-11-2025
Date of Completion: 27-11-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO ZILLA PARISHAD Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Bijepi Bag
Administrative Approval Details
Approval No.: OD/347/3320/116535/379752/00065319/AS
Technical Sanction Details
Technical Sanction No.: OD/347/3320/116535/379752/00065319/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 485721
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 8.24 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 37.523 Cum 1 37.523 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 45.763 Cum - - 2.29 104.79727 0.48 21.96624 0.96 43.93248 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 26.9411 Cum - - 3.23 87.019753 0.45 12.123495 - - 0.9 24.24699 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 82.4 Sqm - - - - - - - - - - 0.00267 0.220008 0.126 10.3824
Total Qty 37.523 191.817023 34.089735 43.93248 24.24699 0.220008 10.3824
Rate Per Unit 401.41 637.012 409.04 1354.39 1802.83 58620.646 276.666
Total Amount 15062.10743 122189.74545528 13944.0652044 59501.7115872 43713.2009817 12897.011085168 2872.4570784
Total Material Amount (in Rs.): 270180.29882214