| State: Odisha |
District: Dhenkanal |
Block: Kankada Had |
Gram Panchayat: Chandapur |
Work Code: OD/352/3354/117370/402270/00067756 (Construction of Chandapur Pry School Boundary Wall)
Project Category: Other Infrastructure
| Financial Year: 2022-23 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Kankada Had |
Bill Status:
1st Bill
|
| Proposal Date: - |
Date of Commencement: 06-12-2025 |
| Date of Completion: - |
Scheme Name: 5th SFC Grant in Aid |
| Scheme Component Name: Maintenance of Primary School Building |
Project Sub-Category: Boundary Wall |
| Project Type: New Work |
Name of Executant: NARAHARI BEHERA |
Administrative Approval Details
Approval No.: OD/352/3354/117370/402270/00067756/AS
Technical Sanction Details
Technical Sanction No.: OD/352/3354/117370/402270/00067756/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 275000
MATERIAL STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM029 |
BRM340 |
BRM028 |
BRM044 |
BRM005 |
BRMMR0025 |
BRM143 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge |
24.75 |
Cum |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. |
6.1875 |
Cum |
1 |
6.1875 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 3 |
Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
4.125 |
Cum |
- |
- |
2.29 |
9.44625 |
0.48 |
1.98 |
0.96 |
3.96 |
- |
- |
- |
- |
- |
- |
| 4 |
Masonry Brick Work (AR0603b) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. |
8.59375 |
Cum |
- |
- |
0.672 |
5.775 |
0.28 |
2.40625 |
- |
- |
350 |
3007.8125 |
- |
- |
- |
- |
| 5 |
Masonry Brick Work (AR0603bi) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. |
24.75 |
Cum |
- |
- |
0.672 |
16.632 |
0.28 |
6.93 |
- |
- |
350 |
8662.5 |
1 |
24.75 |
- |
- |
| 6 |
Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. |
112.75 |
Sqm |
- |
- |
0.0358 |
4.03645 |
0.015 |
1.69125 |
- |
- |
- |
- |
- |
- |
- |
- |
| 7 |
Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. |
99 |
Sqm |
- |
- |
0.043 |
4.257 |
0.018 |
1.782 |
- |
- |
- |
- |
- |
- |
- |
- |
| 8 |
Painting(AR0918c) :.Finishing wall with two coat water proofing cement paint including one coat cement wash on the outer surface of approved shade on new work (Outside) - Finishing wall with two coat water proofing cement paint including one coat cement wash on the outer surface of approved shade on new work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) |
211.75 |
Sqm |
- |
- |
0.010763440860215 |
2.2791586021505 |
- |
- |
- |
- |
- |
- |
- |
- |
0.25 |
52.9375 |
| Total Qty |
6.1875 |
42.425858602151 |
14.7895 |
3.96 |
11670.3125 |
24.75 |
52.9375 |
| Rate Per Unit |
933.85 |
569.612 |
938.79 |
2087.16 |
6.13555 |
33 |
48.13732 |
| Total Amount |
5778.196875 |
24166.278170088 |
13884.234705 |
8265.1536 |
71603.785859375 |
816.75 |
2548.2693775 |
Total Material Amount (in Rs.): 127062.66858696