Material Statement

State: Odisha District: Koraput Block: Semiliguda Gram Panchayat: Upparkanti
Work Code: OD/363/3479/119928/430115/00067784 (CC Road from Church to Village Upper Chindri)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Semiliguda Bill Status: 1st Bill
Proposal Date: - Date of Commencement: 06-12-2025
Date of Completion: - Scheme Name: Bikashita Gaon Bikashita Odisha
Scheme Component Name: Viksit Gaon Vikshit Odisha (VGVO) Project Sub-Category: CC Road
Project Type: New Work Name of Executant: SMT PREETIMAYEE PANIGRAHI
Administrative Approval Details
Approval No.: OD/363/3479/119928/430115/00067784/AS
Technical Sanction Details
Technical Sanction No.: OD/363/3479/119928/430115/00067784/TS
Fund Sanction No.: 2312345634
Fund Sanction Amount (in Rs.): 300000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM104 BRM092 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 2.76 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 29.67 Cum 1 29.67 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 22.54 Cum - - 2.29 51.6166 0.48 10.8192 0.96 21.6384 - - - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 8.05 Sqm - - - - - - - - 0.00267 0.0214935 0.126 1.0143 - -
5 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 14.835 Cum - - 3.23 47.91705 0.45 6.67575 - - - - - - 0.9 13.3515
Total Qty 29.67 99.53365 17.49495 21.6384 0.0214935 1.0143 13.3515
Rate Per Unit 803.65 613.902 1305.77 1726.96 58906.006 562.026 2128.33
Total Amount 23844.2955 61103.9068023 22844.3808615 37368.651264 1266.096239961 570.0629718 28416.397995
Total Material Amount (in Rs.): 175413.79163456