Material Statement

State: Odisha District: Rayagada Block: Gunupur Gram Panchayat: Jagannathpur
Work Code: OD/370/3550/121150/426811/00068569 (CONSTRUCTION OF CULVERT FROM PWD ROAD TO HATIBADI ROAD)
Project Category: CD Work
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Gunupur Bill Status: Final Bill
Proposal Date: 02-06-2023 Date of Commencement: 10-12-2025
Date of Completion: 26-01-2026 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: Slab Culvert
Project Type: New Work Name of Executant: Ashok Kumar Nayak
Administrative Approval Details
Approval No.: OD/370/3550/121150/426811/00068569/AS
Technical Sanction Details
Technical Sanction No.: OD/370/3550/121150/426811/00068569/TS
Fund Sanction No.: 11827
Fund Sanction Amount (in Rs.): 143788
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM060 BRM052 BRM084 BRM104 BRM162 BRM341 BRM044
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 34.434 Cum - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 14.484 Cum 1 14.484 - - - - - - - - - - - - - - - - - -
3 R.C.C. Work (AR0404Ag) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 3.6 Cum - - 3.4733 12.50388 0.45 1.62 0.36 1.296 0.54 1.944 6.2216 22.39776 0.0502172 0.18078192 - - - - - -
4 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 3.22 Qntl - - - - - - - - - - - - - - 0.8 2.576 1.05 3.381 - -
5 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 10.638 Cum - - 2.29 24.36102 0.48 5.10624 - - - - - - - - - - - - 0.96 10.21248
Total Qty 14.484 36.8649 6.72624 1.296 1.944 22.39776 0.18078192 2.576 3.381 10.21248
Rate Per Unit 347.95 600.692 352.89 1759.78 1658.3 297.726 58620.646 90.1 6209.112 1291.11
Total Amount 5039.7078 22144.4505108 2373.6228336 2280.67488 3223.7352 6668.39549376 10597.55293552 232.0976 20993.007672 13185.4350528
Total Material Amount (in Rs.): 86738.67997848