Material Statement

State: Odisha District: Cuttack Block: Kantapada Gram Panchayat: Postal
Work Code: OD/350/3338/116983/400215/00068801 (Cement Concrete Road from Dasa Sahi Bridge to PMGSY Road)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Kantapada Bill Status: Final Bill
Proposal Date: - Date of Commencement: 11-12-2025
Date of Completion: 02-01-2026 Scheme Name: Bikashita Gaon Bikashita Odisha
Scheme Component Name: Viksit Gaon Vikshit Odisha (VGVO) Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Lopamudra Das
Administrative Approval Details
Approval No.: OD/350/3338/116983/400215/00068801/AS
Technical Sanction Details
Technical Sanction No.: OD/350/3338/116983/400215/00068801/TS
Fund Sanction No.: 3430
Fund Sanction Amount (in Rs.): 1000000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 8.7 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 45.66525 Cum 1 45.66525 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 72.847875 Cum - - 2.29 166.82163375 0.48 34.96698 0.96 69.93396 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 63.956765 Cum - - 3.23 206.58035095 0.45 28.78054425 - - 0.9 57.5610885 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 87 Sqm - - - - - - - - - - 0.00267 0.23229 0.126 10.962
Total Qty 45.66525 373.4019847 63.74752425 69.93396 57.5610885 0.23229 10.962
Rate Per Unit 478.15 569.712 483.09 2176.31 2604.91 58620.646 276.666
Total Amount 21834.8392875 212731.59150741 30795.791489932 152197.9764876 149941.45504453 13616.98985934 3032.812692
Total Material Amount (in Rs.): 584151.45636831