Material Statement

State: Odisha District: Puri Block: Krushnaprasad Gram Panchayat: Titipa
Work Code: OD/369/3542/121010/410198/00070048 (Imp of CC road from Brundabati Mandap to Kothaghara at Deulapada)
Project Category: Road
Financial Year: 2020-21 Execution Level: ps
Executing Agency: Panchayat Samiti, Krushnaprasad Bill Status: Final Bill
Proposal Date: - Date of Commencement: 12-12-2025
Date of Completion: 16-12-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES Project Sub-Category: CC Road
Project Type: Repair and Maintenance Name of Executant: Ramendra Narayan Kar
Administrative Approval Details
Approval No.: OD/369/3542/121010/410198/00070048/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3542/121010/410198/00070048/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 100000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM104 BRM092 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 4.67775 Cum 1 4.67775 - - - - - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 7.05375 Cum - - 2.29 16.1530875 0.48 3.3858 0.96 6.7716 - - - - - -
3 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 7.326 Sqm - - - - - - - - 0.00267 0.01956042 0.126 0.923076 - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 6.31125 Cum - - 3.23 20.3853375 0.45 2.8400625 - - - - - - 0.9 5.680125
5 Earth Work (AR0110) :.Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. 74.25 Sqm - - - - - - - - - - - - - -
Total Qty 4.67775 36.538425 6.2258625 6.7716 0.01956042 0.923076 5.680125
Rate Per Unit 336.51 595.407 1166.91 1938.91 58573.086 229.106 2350.53
Total Amount 1574.1096525 21755.234013975 7265.021209875 13129.522956 1145.7141628561 211.482250056 13351.30421625
Total Material Amount (in Rs.): 58432.388461512