Material Statement

State: Odisha District: Kendujhar Block: Champua Gram Panchayat: Sunaposi
Work Code: OD/361/3445/119307/385433/00072038 (Construction of Road from Giridharipur Shiv Temple to Jodapokhari)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Champua Bill Status: 1st Bill
Proposal Date: 03-06-2023 Date of Commencement: 15-01-2026
Date of Completion: - Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Bebina Tarai
Administrative Approval Details
Approval No.: OD/361/3445/119307/385433/00072038/AS
Technical Sanction Details
Technical Sanction No.: OD/361/3445/119307/385433/00072038/TS
Fund Sanction No.: 11939
Fund Sanction Amount (in Rs.): 249642
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM045 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 5.3907255 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 12.31076319 Cum 1 12.31076319 - - - - - - - - - - - -
3 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 21.28721472 Cum - - 2.29 48.7477217088 0.48 10.2178630656 0.96 20.4357261312 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 12.968475 Cum - - 3.23 41.88817425 0.45 5.83581375 - - 0.9 11.6716275 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 16.487892 Sqm - - - - - - - - - - 0.00267 0.04402267164 0.126 2.077474392
Total Qty 12.31076319 90.6358959588 16.0536768156 20.4357261312 11.6716275 0.04402267164 2.077474392
Rate Per Unit 591.41 598.252 601.41 1351.51 1971.51 58573.086 229.106
Total Amount 7280.7084581979 54223.106029144 9654.84177367 27619.088223578 23010.730332525 2578.5437319195 475.96184805355
Total Material Amount (in Rs.): 124842.98039709