Royalty Statement

State: Odisha District: Malkangiri Block: Malkangiri Gram Panchayat: Tandiki
Work Code: OD/364/3484/119979/430224/00013431 (Repair and Maintenance of Rural Haat at Tandiki)
Project Category: Other Infrastructure
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Malkangiri Bill Status: Final Bill
Proposal Date: 11-10-2022 Date of Commencement: 30-07-2025
Date of Completion: 29-07-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance of Capital Assets Project Sub-Category: Rural Haat
Project Type: Repair and Maintenance Name of Executant: Er.BUDHIRAM TIYU
Administrative Approval Details
Approval No.: OD/364/3484/119979/430224/00013431/AS
Technical Sanction Details
Technical Sanction No.: OD/364/3484/119979/430224/00013431/TS
Fund Sanction No.: 12823
Fund Sanction Amount (in Rs.): 400000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM044 BRM029 BRM056 BRM141
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Dismantling (AR1613) :.Removing old lime or cement plaster - Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 14.16 Sqm - - - - - - - - - - - -
2 Dismantling (AR1623) :.Dismantling and removing cement concrete - Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 0.882 Cum - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 14.601375 Cum 2.29 33.43714875 0.48 7.00866 0.96 14.01732 - - - - - -
4 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 19.303125 Cum - - - - - - 1 19.303125 - - - -
5 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 6.13275 Cum 3.23 19.8087825 0.45 2.7597375 - - - - 0.9 5.519475 - -
6 Plastering (AR1026i) :.6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces (outside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in outside with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. 30.68 Sqm 0.0271 0.831428 0.0075 0.2301 - - - - - - - -
7 Painting(AR0903i) :.Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 92.705 Sqm - - - - - - - - - - 0.125 11.588125
Total Qty 54.07735925 9.9984975 14.01732 19.303125 5.519475 11.588125
Rate Per Unit 0 40.25 149.5 40.25 149.5 0
Total Amount 0 402.439524375 2095.58934 776.95078125 825.1615125 0
Total Royalty Amount (in Rs.): 4100.141158125