Royalty Statement

State: Odisha District: Balasore Block: Baleshwar Gram Panchayat: Chanua
Work Code: OD/346/3299/116067/392600/00016720 (Repair & Renovation of Kamachandi Thakurani, Vill/G.P.- Chhanua)
Project Category: Religious Structures
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Baleshwar Bill Status: Final Bill
Proposal Date: - Date of Commencement: 12-03-2025
Date of Completion: 31-05-2025 Scheme Name: Chief Minister Special Assistant
Scheme Component Name: Self/Personal Deposit Project Sub-Category: Religious Structures
Project Type: Renovation or Rejuvenation Name of Executant: MAMATA HANSDA
Administrative Approval Details
Approval No.: OD/346/3299/116067/392600/00016720/AS
Technical Sanction Details
Technical Sanction No.: OD/346/3299/116067/392600/00016720/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 300000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM005 BRM026 BRM045 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Masonry Brick Work (AR0603b) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 1.304413392 Cum 0.672 0.876565799424 0.28 0.36523574976 350 456.5446872 - - - - - - - - - -
2 Masonry Brick Work (AR0603bi) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 0.92178546368 Cum 0.672 0.61943983159296 0.28 0.2580999298304 350 322.624912288 - - - - - - - - - -
3 Earth Work (AR0101a14) :.Earthwork in ordinary soil within 75m to 100m lead and three extra lift - Earthwork in ordinary soil within 75m to 100m lead and three extra lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. 38.75007682144 Cum - - - - - - - - - - - - - - - -
4 Earth Work (AR0115a) :.Filling foundation and plinth with crusher dust well watered and rammed - Filling foundation and plinth with crusher dust well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 37.00038174944 Cum - - - - - - 1 37.00038174944 - - - - - - - -
5 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 18.6393283032 Cum 2.29 42.684061814328 0.48 8.946877585536 - - - - 0.96 17.893755171072 - - - - - -
6 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 10.9487190368 Cum 3.23 35.364362488864 0.45 4.92692356656 - - - - - - 0.9 9.85384713312 - - - -
7 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 8.2144739697 Sqm - - - - - - - - - - - - 0.00267 0.021932645499099 0.000614 0.0050436870173958
Total Qty 79.544429934209 14.497136831686 779.169599488 37.00038174944 17.893755171072 9.85384713312 0.021932645499099 0.0050436870173958
Rate Per Unit 0 427.25 0.04025 413.25 522.5 522.5 0 0
Total Amount 0 6193.901711338 31.361576379392 15290.407757956 9349.4870768851 5148.6351270552 0 0
Total Royalty Amount (in Rs.): 36013.793249614