Royalty Statement

State: Odisha District: Bargarh Block: Bhatli Gram Panchayat: Tejagola
Work Code: OD/347/3314/116432/380697/00018591 (Imp. of Road with CC/ Grade-II Metalling from Tejagola to Boulsingha)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Bhatli Bill Status: 1st Bill
Proposal Date: - Date of Commencement: 10-10-2025
Date of Completion: - Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: Peskar Dharua
Administrative Approval Details
Approval No.: OD/347/3314/116432/380697/00018591/AS
Technical Sanction Details
Technical Sanction No.: OD/347/3314/116432/380697/00018591/TS
Fund Sanction No.: 1130
Fund Sanction Amount (in Rs.): 663000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM044 BRM056 BRM104 BRM092 BRM029
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 54.505 Cum 2.29 124.81645 0.48 26.1624 0.96 52.3248 - - - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 35.42825 Cum 3.23 114.4332475 0.45 15.9427125 - - 0.9 31.885425 - - - - - -
3 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 53.13 Sqm - - - - - - - - 0.00267 0.1418571 0.000614 0.03262182 - -
4 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 54.505 Cum - - - - - - - - - - - - - -
5 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 54.505 Cum - - - - - - - - - - - - 1 54.505
Total Qty 239.2496975 42.1051125 52.3248 31.885425 0.1418571 0.03262182 54.505
Rate Per Unit 0 165.25 249.5 249.5 0 0 165.25
Total Amount 0 6957.869840625 13055.0376 7955.4135375 0 0 9006.95125
Total Royalty Amount (in Rs.): 36975.272228125