Royalty Statement

State: Odisha District: Cuttack Block: Tangi Choudwar Gram Panchayat: Salagaon
Work Code: OD/350/3344/117165/399291/00020116 (Imp. of C.C Road from Luntikiri Barapada RD Road to Bamburi, Village Bamburi)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Tangi Choudwar Bill Status: Final Bill
Proposal Date: - Date of Commencement: 19-11-2025
Date of Completion: 20-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Manas Kumar Kar
Administrative Approval Details
Approval No.: OD/350/3344/117165/399291/00020116/AS
Technical Sanction Details
Technical Sanction No.: OD/350/3344/117165/399291/00020116/TS
Fund Sanction No.: 31142
Fund Sanction Amount (in Rs.): 186532
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 1.66375 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 14.956875 Cum 1 14.956875 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 15.541875 Cum - - 2.29 35.59089375 0.48 7.4601 0.96 14.9202 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 10.813125 Cum - - 3.23 34.92639375 0.45 4.86590625 - - 0.9 9.7318125 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 22.82 Sqm - - - - - - - - - - 0.00267 0.0609294 0.000614 0.01401148
Total Qty 14.956875 70.5172875 12.32600625 14.9202 9.7318125 0.0609294 0.01401148
Rate Per Unit 82.25 0 82.25 158.5 158.5 0 0
Total Amount 1230.20296875 0 1013.8140140625 2364.8517 1542.49228125 0 0
Total Royalty Amount (in Rs.): 6151.3609640625