Royalty Statement

State: Odisha District: Mayurbhanj Block: Kusumi Gram Panchayat: Talapati
Work Code: OD/365/3501/120270/388301/00025229 (Construction Of Cc Road From Dhananjay House To Chete House At Banduda Village)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Kusumi Bill Status: Final Bill
Proposal Date: - Date of Commencement: 23-09-2025
Date of Completion: 12-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Jagat Kishore Naik
Administrative Approval Details
Approval No.: OD/365/3501/120270/388301/00025229/AS
Technical Sanction Details
Technical Sanction No.: OD/365/3501/120270/388301/00025229/TS
Fund Sanction No.: 1608
Fund Sanction Amount (in Rs.): 143788
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 9.52190344512 Cum 1 9.52190344512 - - - - - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 11.1041216352 Cum - - 2.29 25.428438544608 0.48 5.329978384896 0.96 10.659956769792 - - - - - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 7.220784 Cum - - 3.23 23.32313232 0.45 3.2493528 - - 0.9 6.4987056 - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 15.73033596 Sqm - - - - - - - - - - 0.00267 0.0419999970132 0.000614 0.00965842627944
5 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 3.16443638016 Cum - - - - - - - - - - - - - -
Total Qty 9.52190344512 48.751570864608 8.579331184896 10.659956769792 6.4987056 0.0419999970132 0.00965842627944
Rate Per Unit 293.25 0 293.25 516.5 516.5 0 0
Total Amount 2792.2981852814 0 2515.8888699708 5505.8676715976 3356.5814424 0 0
Total Royalty Amount (in Rs.): 14170.63616925