Royalty Statement

State: Odisha District: Kandhamal Block: Phiringia Gram Panchayat: Ratanga
Work Code: OD/359/3429/118973/416411/00031773 (Improvement Of Road From Behera Sahi To Shivamandir Temple)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Phiringia Bill Status: Final Bill
Proposal Date: - Date of Commencement: 21-07-2025
Date of Completion: 29-07-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: SUMANTA BHOI
Administrative Approval Details
Approval No.: OD/359/3429/118973/416411/00031773/AS
Technical Sanction Details
Technical Sanction No.: OD/359/3429/118973/416411/00031773/TS
Fund Sanction No.: 15598
Fund Sanction Amount (in Rs.): 300000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM045 BRM056 BRM104 BRM092 BRM060 BRM052 BRM341 BRM084
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 36.9551076336 Cum - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 15.9296328216 Cum 1 15.9296328216 - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 22.2006163508 Cum - - 2.29 50.839411443332 0.48 10.656295848384 0.96 21.312591696768 - - - - - - - - - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 16.569186163 Cum - - 3.23 53.51847130649 0.45 7.45613377335 - - 0.9 14.9122675467 - - - - - - - - - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 34.2091244 Sqm - - - - - - - - - - 0.00267 0.091338362148 0.000614 0.0210044023816 - - - - - - - -
6 R.C.C. Work (AR0404A) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) 0.6785208 Cum - - 3.4733 2.35670629464 0.45 0.30533436 - - - - - - - - 0.36 0.244267488 0.54 0.366401232 - - - -
7 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 0.55 Qntl - - - - - - - - - - - - - - - - - - 1.05 0.5775 - -
8 R.C.C. Work (AR0410a) :.Centring & Shuttering for R.C.C. floor and roof slabs, landings,balconies, projecting sun shades and chajjas - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. floor and roof slabs, landings, balconies, projecting sun shades and chajjas up to 4.3m height 6.6888 Sqm - - - - - - - - - - 0.0050222222222222 0.03359264 - - - - - - - - 0.0076666666666667 0.0512808
Total Qty 15.9296328216 106.71458904446 18.417763981734 21.312591696768 14.9122675467 0.124931002148 0.0210044023816 0.244267488 0.366401232 0.5775 0.0512808
Rate Per Unit 40.25 0 40.25 149.5 149.5 0 0 149.5 149.5 0 0
Total Amount 641.1677210694 0 741.31500026479 3186.2324586668 2229.3839982316 0 0 36.517989456 54.776984184 0 0
Total Royalty Amount (in Rs.): 6889.3941518727