Royalty Statement

State: Odisha District: Mayurbhanj Block: Kaptipada Gram Panchayat: Notto
Work Code: OD/365/3497/120207/391258/00033020 (Maintenance of CC Road from Nanasahi village road in PC PUR (CR-Q/22/24-25))
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Kaptipada Bill Status: Final Bill
Proposal Date: - Date of Commencement: 24-07-2025
Date of Completion: 06-08-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: Repair and Maintenance Name of Executant: Madhusudan Das
Administrative Approval Details
Approval No.: OD/365/3497/120207/391258/00033020/AS
Technical Sanction Details
Technical Sanction No.: OD/365/3497/120207/391258/00033020/TS
Fund Sanction No.: 6908
Fund Sanction Amount (in Rs.): 500000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM104 BRM092 BRM340 BRM028 BRM056 BRM029 BRM044
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 29.68 Sqm 0.00267 0.0792456 0.000614 0.01822352 - - - - - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 22.545 Cum - - - - 3.23 72.82035 0.45 10.14525 0.9 20.2905 - - - -
3 Earth Work (AR0101a1) :.Earthwork in ordinary soil within 50m to 75m lead and 1.5m, initial lift - Earthwork in ordinary soil within 50m to 75m lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. 14.2464 Cum - - - - - - - - - - - - - -
4 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 28.23 Cum - - - - - - - - - - 1 28.23 - -
5 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 36.71 Cum - - - - - - - - - - - - - -
6 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 38.54 Cum - - - - 2.29 88.2566 0.48 18.4992 - - - - 0.96 36.9984
Total Qty 0.0792456 0.01822352 161.07695 28.64445 20.2905 28.23 36.9984
Rate Per Unit 0 0 0 353.25 579.5 353.25 579.5
Total Amount 0 0 0 10118.6519625 11758.34475 9972.2475 21440.5728
Total Royalty Amount (in Rs.): 53289.8170125