Royalty Statement

State: Odisha District: Malkangiri Block: Kalimela Gram Panchayat: Bodigetta
Work Code: OD/364/3480/119930/431032/00041251 (Construction of C road at Tekguda colony)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Kalimela Bill Status: Final Bill
Proposal Date: - Date of Commencement: 27-11-2025
Date of Completion: 08-12-2025 Scheme Name: Chief Minister Special Assistant
Scheme Component Name: Special Problem Fund (SPF) 16 th Phase Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Bibek Jani JE
Administrative Approval Details
Approval No.: OD/364/3480/119930/431032/00041251/AS
Technical Sanction Details
Technical Sanction No.: OD/364/3480/119930/431032/00041251/TS
Fund Sanction No.: 1363
Fund Sanction Amount (in Rs.): 400000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 41.08 Cum - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 28.2 Cum 1 28.2 - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 38.78 Cum - - 2.29 88.8062 0.48 18.6144 0.96 37.2288 - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 22.875 Cum - - 3.23 73.88625 0.45 10.29375 - - 0.9 20.5875
Total Qty 28.2 162.69245 28.90815 37.2288 20.5875
Rate Per Unit 80.25 0 80.25 299.5 299.5
Total Amount 2263.05 0 2319.8790375 11150.0256 6165.95625
Total Royalty Amount (in Rs.): 21898.9108875