Royalty Statement

State: Odisha District: Bargarh Block: Ambabhona Gram Panchayat: Bhukta
Work Code: OD/347/3310/116335/380798/00042081 (Improvement Of Bhukta Bypass Road)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Ambabhona Bill Status: Final Bill
Proposal Date: - Date of Commencement: 09-01-2026
Date of Completion: 17-01-2026 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: Mettalling Road
Project Type: Upgradation or Improvement Name of Executant: SANDEEP BECK
Administrative Approval Details
Approval No.: OD/347/3310/116335/380798/00042081/AS
Technical Sanction Details
Technical Sanction No.: OD/347/3310/116335/380798/00042081/TS
Fund Sanction No.: 11939
Fund Sanction Amount (in Rs.): 250000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 8.2392 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 12.3588 Cum 1 12.3588 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 16.4784 Cum - - 2.29 37.735536 0.48 7.909632 0.96 15.819264 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 17.9784 Cum - - 3.23 58.070232 0.45 8.09028 - - 0.9 16.18056 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 6.62 Sqm - - - - - - - - - - 0.00267 0.0176754 0.000614 0.00406468
Total Qty 12.3588 95.805768 15.999912 15.819264 16.18056 0.0176754 0.00406468
Rate Per Unit 177.5 0 177.5 295 295 0 0
Total Amount 2193.687 0 2839.98438 4666.68288 4773.2652 0 0
Total Royalty Amount (in Rs.): 14473.61946