Royalty Statement

State: Odisha District: Gajapati Block: Gumma Gram Panchayat: Gaiba
Work Code: OD/353/3358/117463/414428/00047993 (Improvement of Road from Buruda Main Road to Pada Sahi)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Gumma Bill Status: Final Bill
Proposal Date: - Date of Commencement: 08-08-2025
Date of Completion: 21-08-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: PRASANT KUMAR MISHRA
Administrative Approval Details
Approval No.: OD/353/3358/117463/414428/00047993/AS
Technical Sanction Details
Technical Sanction No.: OD/353/3358/117463/414428/00047993/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 200000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM045 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 2.2905 Cum - - - - - - - - - - - -
2 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 19.836 Cum 2.29 45.42444 0.48 9.52128 0.96 19.04256 - - - - - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 7.884 Cum 3.23 25.46532 0.45 3.5478 - - 0.9 7.0956 - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 14.252 Sqm - - - - - - - - 0.00267 0.03805284 0.000614 0.008750728
Total Qty 70.88976 13.06908 19.04256 7.0956 0.03805284 0.008750728
Rate Per Unit 0 319.5 419 419 0 0
Total Amount 0 4175.57106 7978.83264 2973.0564 0 0
Total Royalty Amount (in Rs.): 15127.4601