Royalty Statement

State: Odisha District: Nabarangpur Block: Jhorigam Gram Panchayat: Palia
Work Code: OD/366/3515/120458/427559/00050345 (Const. R.C.C Culvert at Solaguda under Palia GP)
Project Category: CD Work
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Jhorigam Bill Status: Final Bill
Proposal Date: 15-05-2025 Date of Commencement: 09-10-2025
Date of Completion: 18-11-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: Slab Culvert
Project Type: New Work Name of Executant: Bharat Krishna Rout
Administrative Approval Details
Approval No.: OD/366/3515/120458/427559/00050345/AS
Technical Sanction Details
Technical Sanction No.: OD/366/3515/120458/427559/00050345/TS
Fund Sanction No.: 15612
Fund Sanction Amount (in Rs.): 300000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM060 BRM052 BRM084 BRM104 BRM341
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 31.5945 Cum - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 3.6165 Cum 1 3.6165 - - - - - - - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 34.2045 Cum - - 2.29 78.328305 0.48 16.41816 0.96 32.83632 - - - - - - - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 0.50625 Cum - - 3.23 1.6351875 0.45 0.2278125 - - 0.9 0.455625 - - - - - - - - - -
5 R.C.C. Work (AR0404Ag) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 4.21875 Cum - - 3.4733 14.652984375 0.45 1.8984375 - - - - 0.36 1.51875 0.54 2.278125 0.076659 0.32340515625 0.0502172 0.2118538125 - -
6 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 4.342985 Qntl - - - - - - - - - - - - - - - - - - 1.05 4.56013425
Total Qty 3.6165 94.616476875 18.54441 32.83632 0.455625 1.51875 2.278125 0.32340515625 0.2118538125 4.56013425
Rate Per Unit 150.92 0 150.92 176.5 176.5 176.5 176.5 0 0 0
Total Amount 545.80218 0 2798.7223572 5795.61048 80.4178125 268.059375 402.0890625 0 0 0
Total Royalty Amount (in Rs.): 9890.7012672