Royalty Statement

State: Odisha District: Deogarh Block: Tileibani Gram Panchayat: Kansar
Work Code: OD/351/3348/117229/383295/00051537 (Const of CD Works with road from terendakata to kashipada)
Project Category: Road
Financial Year: 2021-22 Execution Level: ps
Executing Agency: Panchayat Samiti, Tileibani Bill Status: Final Bill
Proposal Date: - Date of Commencement: 06-09-2025
Date of Completion: 23-09-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: MANORANJAN BEHERA
Administrative Approval Details
Approval No.: OD/351/3348/117229/383295/00051537/AS
Technical Sanction Details
Technical Sanction No.: OD/351/3348/117229/383295/00051537/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 653680
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 7.285 Cum - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 20.76225 Cum 1 20.76225 - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 70.49 Cum - - 2.29 161.4221 0.48 33.8352 0.96 67.6704 - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 27.4255 Cum - - 3.23 88.584365 0.45 12.341475 - - 0.9 24.68295
Total Qty 20.76225 250.006465 46.176675 67.6704 24.68295
Rate Per Unit 40.25 0 560.25 156.5 156.5
Total Amount 835.6805625 0 25870.48216875 10590.4176 3862.881675
Total Royalty Amount (in Rs.): 41159.46200625