Royalty Statement

State: Odisha District: Gajapati Block: R.Udayagiri Gram Panchayat: Mangarajpur
Work Code: OD/353/3362/117540/415053/00051907 (Improvement of road with CC/Grade-II Metalling from Dihudisahi to Gulban)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, R.Udayagiri Bill Status: Final Bill
Proposal Date: - Date of Commencement: 17-10-2025
Date of Completion: 14-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: Sushant Kumar Sahoo
Administrative Approval Details
Approval No.: OD/353/3362/117540/415053/00051907/AS
Technical Sanction Details
Technical Sanction No.: OD/353/3362/117540/415053/00051907/TS
Fund Sanction No.: 31142
Fund Sanction Amount (in Rs.): 215757
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM104 BRM092 BRM340 BRM028 BRM056 BRM045
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0103a) :.Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift - Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department 24.1721 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 5.92 Cum 1 5.92 - - - - - - - - - - - -
3 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 29.6 Sqm - - 0.00267 0.079032 0.000614 0.0181744 - - - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 10.12875 Cum - - - - - - 3.23 32.7158625 0.45 4.5579375 0.9 9.115875 - -
5 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 17.4196 Cum - - - - - - 2.29 39.890884 0.48 8.361408 - - 0.96 16.722816
Total Qty 5.92 0.079032 0.0181744 72.6067465 12.9193455 9.115875 16.722816
Rate Per Unit 279.25 0 0 0 279.25 269.5 269.5
Total Amount 1653.16 0 0 0 3607.727230875 2456.7283125 4506.798912
Total Royalty Amount (in Rs.): 12224.414455375