Royalty Statement

State: Odisha District: Balasore Block: Oupada Gram Panchayat: Shyamasundarpur
Work Code: OD/346/3306/116264/393202/00052045 (Construction of CC road from karunakar Parida house to Pradeep Behera house)
Project Category: Road
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Oupada Bill Status: Final Bill
Proposal Date: 03-12-2022 Date of Commencement: 15-09-2025
Date of Completion: 16-09-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO ZILLA PARISHAD Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Jyotirashmi Nayak
Administrative Approval Details
Approval No.: OD/346/3306/116264/393202/00052045/AS
Technical Sanction Details
Technical Sanction No.: OD/346/3306/116264/393202/00052045/TS
Fund Sanction No.: 4897
Fund Sanction Amount (in Rs.): 100000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM045 BRM104 BRM092 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 1.0412415321 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 5.4058581892 Cum 1 5.4058581892 - - - - - - - - - - - -
3 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 7.461208685 Cum - - 2.29 17.08616788865 0.48 3.5813801688 0.96 7.1627603376 - - - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 0.10105662 Sqm - - - - - - - - 0.00267 0.0002698211754 0.000614 6.204876468E-5 - -
5 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 5.6034 Cum - - 3.23 18.098982 0.45 2.52153 - - - - - - 0.9 5.04306
Total Qty 5.4058581892 35.18514988865 6.1029101688 7.1627603376 0.0002698211754 6.204876468E-5 5.04306
Rate Per Unit 442.25 0 442.25 522.5 0 0 522.5
Total Amount 2390.7407841737 0 2699.0120221518 3742.542276396 0 0 2634.99885
Total Royalty Amount (in Rs.): 11467.293932721