Royalty Statement

State: Odisha District: Kandhamal Block: Tumudibandh Gram Panchayat: Belaghar
Work Code: OD/359/3433/119010/417041/00052684 (Renovation of U.P School, Batipada)
Project Category: Building
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Tumudibandh Bill Status: Final Bill
Proposal Date: 22-07-2024 Date of Commencement: 17-10-2025
Date of Completion: 15-12-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance of Primary School Building Project Sub-Category: Elementary School
Project Type: Repair and Maintenance Name of Executant: Ram
Administrative Approval Details
Approval No.: OD/359/3433/119010/417041/00052684/AS
Technical Sanction Details
Technical Sanction No.: OD/359/3433/119010/417041/00052684/TS
Fund Sanction No.: 5579
Fund Sanction Amount (in Rs.): 366880
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM045 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 14.87924378752 Cum - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 7.16211725376 Cum 1 7.16211725376 - - - - - - - -
3 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 5.609062536 Cum - - 2.29 12.84475320744 0.48 2.69235001728 0.96 5.38470003456 - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 4.929176168 Cum - - 3.23 15.92123902264 0.45 2.2181292756 - - 0.9 4.4362585512
Total Qty 7.16211725376 28.76599223008 4.91047929288 5.38470003456 4.4362585512
Rate Per Unit 40.25 0 40.25 149.5 149.5
Total Amount 288.27521946384 0 197.64679153842 805.01265516672 663.2206534044
Total Royalty Amount (in Rs.): 1954.1553195734