| State: Odisha |
District: Balasore |
Block: Soro |
Gram Panchayat: Antapur |
Work Code: OD/346/3309/116311/393969/00054168 (Repair and Restoration of road from Jogeswari Temple to Parida Sahi Ainiri)
Project Category: Road
| Financial Year: 2024-25 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Soro |
Bill Status:
Final Bill
|
| Proposal Date: 22-11-2024 |
Date of Commencement: 20-09-2025 |
| Date of Completion: 22-09-2025 |
Scheme Name: Severe Cyclonic Storm DANA 2024 |
| Scheme Component Name: Self/Personal Deposit |
Project Sub-Category: CC Road |
| Project Type: New Work |
Name of Executant: Rojalin Jena |
Administrative Approval Details
Approval No.: OD/346/3309/116311/393969/00054168/AS
Technical Sanction Details
Technical Sanction No.: OD/346/3309/116311/393969/00054168/TS
Fund Sanction No.: 27033
Fund Sanction Amount (in Rs.): 30000
ROYALTY STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM340 |
BRM028 |
BRM056 |
BRM104 |
BRM092 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. |
3.71457 |
Cum |
3.23 |
11.9980611 |
0.45 |
1.6715565 |
0.9 |
3.343113 |
- |
- |
- |
- |
| 2 |
R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc |
2.682 |
Sqm |
- |
- |
- |
- |
- |
- |
0.00267 |
0.00716094 |
0.000614 |
0.001646748 |
| Total Qty |
11.9980611 |
1.6715565 |
3.343113 |
0.00716094 |
0.001646748 |
| Rate Per Unit |
0 |
482.5 |
702 |
0 |
0 |
| Total Amount |
0 |
806.52601125 |
2346.865326 |
0 |
0 |
Total Royalty Amount (in Rs.): 3153.39133725